Project Schedule
what you can do on the project
- time based -keeping on track -be on budget
- coordinating -materials -contractors -inspections
  1. Site Establishment -clear site of vegetation and rubbish, need to get to solid -top soil
  2. Site set out -profiles, string lines
  3. Foundation -ground plate (hilti nail gun), jack studs, braces
  4. Sub Floor/Floor -bearers, joist, insulation, fixings
  5. Wall Framing -erect frames, brace (temporary), plumb, straighten the frames, square diagonally. Fixings, straighten studs
  6. Roof Framing -trusses/braces, purlins, fascia,
  7. Exterior Cladding -Building wrap, cavity batterns, cladding material, windows and doors
  8. Interior Cladding -Insulation, plumbing, electrical, telephone, gas, tv cables, vacum, -Gib
  9. Finishing work -Interior door, kitchen, toilets, bathrooms, laundry, finishing trims, tiling
  10. Paint -drainlaying, driveway
In the workshop starting on the joints:
  • Dove tail joint
  • Halving joint
  • Bridle Joint
  • Mitre halving joint
  • Cross halving joint
  • Stopped halving joint
  • Hauched mortise and tenon joint
  • Mortise and tenon joint
  • Dove tail bridle joint

1 comment:

  1. Insulated Flooring Panels is a major issue in home and building construction. Some methods of providing insulation can be costly. Some insulation techniques may seem like a good deal, but won't provide the proper protection you need for the climate in which the home or building is located. Educating yourself on the different options you have available can help you make the right decision when choosing the right insulation for your home or custom building. For more info click here