April 4
- The first week of April and the week i step up to the plate of becoming leader. The things i found challenging about being leader was not do you only have to worry about what you do and how you work but to also make sure everyone else has something to do and that their doing there job correctly. first by making sure that we construct the frames fast and accurately. by the end of the day we finished both walls A and B but with different measurements for the windows.
- The studs and trimming studs we marked had to be angled off at the end at 6 degrees so that the roof can be on an angle when it goes on top. The length of the window on wall A was 410mm leaving the extra 10mm for the gap and the width at Lintel . For the small window at Wall B it was measured at 900mm.
No comments:
Post a Comment